§ 28-21. Connection to system required.  


Latest version.
  • All persons, or the duly constituted agents thereof, owning improved real property in the city, shall, upon written notice, within ten days connect their property with the waterworks system of the city, where such waterworks system is within 300 feet of the property line.

(Code 1966, § 20-1)