§ 23-19. Sanitation of construction containers.  


Latest version.
  • The following requirements shall apply while the construction dumpster is on or at the site:

    (1)

    The area around the construction dumpster shall be kept free of debris and litter;

    (2)

    Any construction dumpster into which animal or vegetable waste or material has been dumped or deposited shall be removed or emptied within 24 hours; and

    (3)

    Any construction dumpster producing or causing noxious, foul or offensive odors shall be immediately removed or cleaned to eliminate the odor.

    (4)

    A full construction dumpster shall be removed from the property within two days.

    (5)

    Compliance with this section shall be the responsibility of the building contractor.

(Ord. No. 3361, 12-12-2006)