§ 23-19. Sanitation of construction containers.
The following requirements shall apply while the construction dumpster is on or at the site:
(1)
The area around the construction dumpster shall be kept free of debris and litter;
(2)
Any construction dumpster into which animal or vegetable waste or material has been dumped or deposited shall be removed or emptied within 24 hours; and
(3)
Any construction dumpster producing or causing noxious, foul or offensive odors shall be immediately removed or cleaned to eliminate the odor.
(4)
A full construction dumpster shall be removed from the property within two days.
(5)
Compliance with this section shall be the responsibility of the building contractor.
(Ord. No. 3361, 12-12-2006)